XV20 / XV18 Link R-454B service & drive warranty

R-454B flammable refrigerant service steps for XV20 Link and XV18 Link units: leak checks, recovery, nitrogen purge time by flow (15, 30 or 60 cu ft/hr) and line-set length, and the drive / MOC warranty pre-authorization.